Services
Part Replacement
& Double Glazing
see also: Restoration & Refurbishment
see also: Reinstatement and Full Replacement
|
|
- Prepare site by covering floors with protective film
- Cover furniture, beds etc with plastic sheeting and fresh dust sheets
- Erect pole system to isolate windows with internal polythene screening (space must allow)
- Dismantle windows
- Prepare and make good box frame
- Apply 3 coats of Microporous Acrylic Paint to box frame
- Check Pulleys, free off and lubricate
- Upgrade weights to balance as required
- Manufacture and install new sashes to match the original fully painted with 3 coats of the same paint system as box frame
- Re-assemble windows including new polyester cords
- Provide and install new retaining beads incorporating integral brush pile draught proofing
- Fit new parting bead to head and rout brush pile to meeting rail of lower sash
- Complete by making good pin holes, cleaning glass and fitting a new suite of window furniture including security and safety stop bolts.
|